history

Saturday, October 1, 2011

PARAPET WALL AND SHADE WORKS COMPLETED

The parapets of the roof and shades on both the sides are completed.Before that, the existing roof was demolished. The truss was maintained like that. It was found that the current height of  the church is not enough and the truss need to be raised. Discussions for the same has been started and will be implemented soon. The mukhavaram work is going on very smoothly. Pictures of it is added here.


shade in the southern side

parapet wall on the southern side